Length of pool = 7m
Breadth
of pool = 4m
Since we need a path of width 1m around the
pool, the outer borders of the path should extend 1m more on all sides of the
pool
so we have path which looks like being made of 4
rectangles
-- the upper and lower ones which are of length
9m and width 1m
--the side ones with length 4m and width
1.
So the total area will
be
2* (9*1) +2*(4*1) = 18+ 8
=26m2
T find the perimeter, consider the out ward edges of
the path.
The length of the outward edges will be 9m, 4m
,9m and 4m respectively
So the perimeter =9*2+4*2 = 26
m
To find the cost of concrete of depth 10 cm = 0.1 m, we
have to find the volume
The longer sides of the path will
have volume = 9(length)*1(width)*0.1(depth) = 0.9m3
The
shorter sides will have volume = 4*1*0.1 = 0.4m3
so the
total volume =0.9*2 +0.4*2 = 1.8 +0.8 = 2.6m3
Cost is $129
per m3
So the total cost is 129 *2.6 =
$258